It’s All Fun and Games Until Someone Gets in the Critical Path | Metal Office Humor Signs | 4″ x 12″

Add to wishlistAdded to wishlistRemoved from wishlist 0
  • OFFICE & CUBICLE ACCESSORIES ~ Decorate your work space, home office or cube with humor.
  • HUMOROUS GIFTS FOR COWORKERS ~ Perfect for birthdays, promotions, Christmas or just because.
  • SUPERIOR QUALITY ~ Our metal signs are made of 24-gauge steel (not flimsy tin).
  • USA MADE ~ Proudly made right here in the USA by a family-owned and operated manufacturer.
  • INTENDED FOR INDOOR USE ~ Avoid direct sunlight to ensure the colors stay true for years to come.
SKU: RK3085_4x12 Categories: , Tag:

$16.99

It’s All Fun and Games Until Someone Gets in the Critical Path.

Funny Office & Cubicle Decor

Made here in the USA from recycled 24-gauge steel. Each piece is:

  • Cut to size and coated in a white base paint.
  • Drilled in all four corners with holes for easy mounting.
  • Powder coated and baked with a special layer that will accept the ink.
  • Artwork is printed on a special transfer paper, which is then heat pressed onto the prepped steel to bake the design onto the surface of the sign.

What you get is a delightful piece of art to adorn your wall! There are many options for how to hang your new sign. We’ve provided just a few ideas below:

  • Screw the piece directly on to walls, wood and other surfaces. Tip: Use double-sided tape to help with placement before setting screws. (Screws & tape not included).
  • Use standoff screws, which puts a spacer between the wall and the art for a more refined look (screws not included).
  • For a more rustic look, find some reclaimed wood and cut it to size (about 1” larger on all four sides). Stain it to coordinate with your colors and then screw the sign onto the board.
  • Attach an arrangement of signs and other items to a stained shipping pallet and hang that on your wall.
  • Glue magnets to the back and easily attach the sign to anything metal (magnets not included).

It’s fine to hang your sign outdoors, but avoid direct sunlight to keep the colors true for years to come.

Details

  • Sold and shipped by Alamazookie.
  • Eligible for the free shipping offer. See our Shipping & Returns Policy for details.
  • Normally ships within two (2) business days.
  • 100% satisfaction guaranteed. Contact us within 30 days of purchase and we’ll jump through hoops to make it right!
  • All Alamazookie designs are protected under copyright law. © 2018 – 2019 Alamazookie®, All Rights Reserved.